Synchro Pro: The Ultimate Guide for 2025

Quick Start with Synchro Pro: Setup and Best Practices—

Introduction

Synchro Pro is a powerful scheduling and project controls software widely used in construction, infrastructure, and large-scale engineering projects. It combines 4D scheduling (time + 3D model), resource planning, risk analysis, and visualisation to help teams coordinate complex builds and make data-driven decisions. This guide walks you through setting up Synchro Pro and presents best practices to get the most value quickly.


Who should read this

This article is for project managers, schedulers, BIM coordinators, and construction planners who are new to Synchro Pro or transitioning from other scheduling tools (like Primavera P6, Microsoft Project, or Navisworks). Basic familiarity with construction scheduling and BIM concepts is assumed.


System requirements and installation

Before installing, ensure your workstation meets the recommended requirements for smooth 4D visualisation:

  • Operating system: Windows 10 or 11 (64-bit)
  • Processor: Quad-core CPU (i7 or equivalent recommended)
  • Memory: 16 GB RAM minimum; 32 GB+ for large models
  • GPU: Dedicated GPU with 4GB+ VRAM (NVIDIA/AMD)
  • Disk: SSD recommended; 10–50 GB free
  • Other: DirectX 11+, latest GPU drivers

Installation steps:

  1. Obtain Synchro Pro installer and license (floating or node-locked).
  2. Run the installer as administrator and follow prompts.
  3. Activate license via the license manager or connect to your organization’s license server.
  4. Update GPU drivers and Windows to avoid compatibility issues.
  5. Install any required plugins (e.g., for Revit, Navisworks, or IFC import).

Initial project setup

  1. Create a new Synchro project: choose a clear naming convention (e.g., ProjectCode_Phase_YY).
  2. Set project start and calendar: define working days, holidays, and shift patterns.
  3. Import schedule: bring in your baseline schedule from Primavera P6 or Microsoft Project using XML/MPX formats, or create a schedule directly in Synchro.
  4. Link 3D model: import 3D models (Navisworks, IFC, or other supported formats). Break large models into manageable federated models if necessary.
  5. Establish WBS and activity coding: align WBS, activity IDs, and resource codes between schedule and model for easy mapping.

Mapping schedule to model (4D linking)

  • Use reliable naming conventions: ensure model element names or GUIDs correspond to activity IDs or codes.
  • Link activities to model elements via the “Link” function—either manually or through spreadsheet import (CSV).
  • Group links logically: by floor, system, or trade to simplify visualization toggling.
  • Validate links: run quick visual checks to ensure activities animate on the correct elements and at the correct times.

Resources, costs, and workpack setup

  • Define resource types (labor, equipment, material) and assign rates.
  • Assign resource loading to activities for realistic production simulation.
  • Use cost codes to track budgets at activity or WBS levels.
  • Create workpacks: export filtered tasks and 3D views for field teams, including instructions, attachments, and QR codes for on-site access.

Clash detection and risk analysis

  • Integrate Navisworks or use Synchro’s clash detection features to identify spatial conflicts early.
  • Schedule resolution activities to fix clashes and track progress.
  • Run scenario analysis: use baseline and compare features to evaluate schedule alternatives, delays, or recovery plans.
  • Conduct critical path analysis and identify float usage.

Visualization and presentations

  • Use camera paths and time-lapse tools to create polished 4D presentations for stakeholders.
  • Customize visuals: color-code activities by status, trade, or criticality.
  • Export video or interactive viewers for clients who don’t have Synchro licenses.
  • Annotate schedules with notes, photos, and attachments for contextual clarity.

Collaboration and data exchange

  • Use Synchro Control (or Synchro Cloud if available) for centralized model and schedule sharing.
  • Maintain a single source of truth: store the master schedule and federated model centrally.
  • Keep change logs: document schedule changes, who made them, and why.
  • Use permission controls to limit edits to authorized users.

Best practices checklist

  • Standardize naming conventions across schedule and model.
  • Keep models federated and split into manageable files.
  • Validate imports and links immediately after importing.
  • Use baselines for comparison before major updates.
  • Keep regular backups and versioning of project files.
  • Train field teams on workpacks and mobile viewers.
  • Review resource and cost assumptions monthly.

Common pitfalls and how to avoid them

  • Overlinking: avoid linking every tiny model element—link at logical assembly levels.
  • Large model lag: split models and use LOD management.
  • Mismatched calendars: ensure schedule and project calendars align.
  • Ignoring stakeholders: involve construction leads early to validate sequence assumptions.

Example workflow (quick starter)

  1. Import P6 schedule.
  2. Import federated Navisworks model.
  3. Set project calendar and baseline.
  4. Map activities to model elements by floor.
  5. Load resources and assign costs.
  6. Run a 4D simulation and export a stakeholder video.
  7. Create workpacks for next two-week lookahead.

Further learning resources

  • Official Synchro documentation and tutorials.
  • Manufacturer webinars and case studies.
  • BIM and construction scheduling forums and user groups.
  • Online courses for 4D scheduling and BIM coordination.

If you want, I can: create a checklist PDF for on-site teams, draft a naming-convention template, or build a sample CSV to import links — which would you prefer?